Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1315
POWER 
9
Note:
a. Check to see if the battery charger is connected. If the cabinet is powered 
by a UPS, there is no battery backup, and this error can be ignored.
System Technician-Demanded Tests: Descriptions 
and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Battery & Battery Charger Query Test, for example, you may also clear errors 
generated from other tests in the testing sequence.
3840(a)
1005 or 
1028
Associated Battery 
& Battery Charger 
Query Test (#5)
test environment 
UU s r 1
1.
Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the appropriate
test description and follow the recommended procedures.
Table 9-512.
System Technician-Demanded Tests: POWER
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Battery & Battery Charger Query Test (#5)
X
X
ND
AC Power Query Test (#78) (a)
X
X
ND
Power Unit Query Test (carrier E) (#127) (b)
X
X
ND
Power Unit Query Test (carrier D) (#127) (b)
X
X
ND
Power Unit Query Test (carrier A) (#127) (b)
X
X
ND
Power Unit Query Test (carrier B) (#127) (b)
X
X
ND
Power Unit Query Test (carrier C) (#127) (b)
X
X
ND
Emergency Transfer Query Test (#124) (c)
X
X
ND
Cabinet Sensors Query Test (#122) (d)
X
X
ND
External Alarm Lead Query Test (#120) (e)
X
X
ND
Continued on next page
Table 9-511. Battery & Battery Charger Error Log Entries  — Continued
Error 
Type
Aux 
Data
Associated Test
Alarm 
Level
On/Off 
Board
Test to Clear Value
Continued on next page