Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1432
SNI-BD (SNI Circuit Pack) 
9
Replacing an SNI Circuit Pack
Simplex PNC
!
WARNING:
Do not power down a Switch Node carrier to replace a circuit pack.
!
WARNING:
Replacing a Switch Node Interface, Switch Node Clock, Expansion 
Interface or DS1 Converter circuit pack on a simplex system disrupts 
service. The service effect can range from outage of a single EPN to outage 
of the entire system.
1.
Enter busyout board UUCSS
UUCSS represents the cabinet-carrier-slot 
address of the circuit pack to be replaced.
2.
Replace the circuit pack
3.
Wait for the circuit pack to reset
Red and green LEDs will light and then go out.
4.
Enter release board UUCSS
!
CAUTION:
Do not busyout any Expansion Interface 
circuit pack after this point.
5.
Enter test alarms long clear for 
category exp-intf.
6.
Wait 5 minutes for SNI-BD, FIBER-LK 
AND DS1C-BD alarms to clear, or 
enter clear firmware counters a-pnc.