Maintenance Object Repair Procedures 
9-1434
SNI-BD (SNI Circuit Pack) 
9
Before using this procedure, first determine whether more than one SNI is unable 
to communicate with software. Verify SNI and SNC circuit pack insertion via the 
list configuration carrier UUC command, where UUC is the cabinet and carrier 
location of a switch node carrier. Check for SNI and SNC insertion for every 
administered switch node carrier.
If all of the SNIs and SNCs are not inserted ("NO BOARD" is displayed for each 
board) in the entire PNC (either the a-pnc or the b-pnc), then the link between the 
PPN EI (on the PNC where SNI and SNC circuit packs did not insert) and the 
connected SNI is not functioning properly. If this case applies, perform the 
following steps:
1. Run the test board UUCSS command on the PPN EI and fix any problems 
found.
2. Perform the manual loopback procedure for the PPN EI.
3. Perform the manual loopback procedure for the SNI connected to the PPN 
EI.
4. Replace the active SNC.
If the system has a two level switch node carrier configuration, i.e. SNI-SNI fiber 
links exist, and the SNIs and SNCs in the second switch node carrier only (the 
switch node carrier that has no SNI connected to the PPN EI) are not inserted 
and at least two SNI-SNI fiber links exist, perform the following steps:
1. Run the test board UUCSS long command on the SNIs in the first switch 
node carrier that are connected to SNIs in the second switch node carrier 
and fix any problems found.
2. Replace the active SNC.
3. Perform the manual loopback procedure for the SNIs in the second switch 
node carrier that are connected to SNIs in the first switch node carrier.
If software is unable to communicate with an EPN EI but can communicate with 
the connected SNI:
1. Run the test board UUCSS long command on the connected SNI and fix 
any problems found.
2. Perform the manual loopback procedure for the EPN EI.
When the connection to the SNI circuit pack is via fiber, a short length of 
optical fiber is required for this procedure. If a metallic cable is used in the 
connection, the metallic connector must be removed from the back of the 
carrier, and a lightwave transceiver connected in its place. The short 
length of optical fiber can then be used.
If this procedure is run on both endpoints on a fiber link (Expansion 
Interface circuit packs or Switch Node Interface circuit packs), and both 
check out fine, then the failure is most likely in the connection (fiber or 
metallic) itself if neither endpoint circuit pack is busied out, but the link 
remains inactive.