Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1726
TDM-CLK (TDM Bus Clock) 
9
4. For Port Networks with more than one Tone-Clock circuit pack, 
interchange Tone-Clocks with the set tone-clock UUC, then run 
test synchronization r 10, and check to see if new 2305 errors are 
reported against the new active Tone-Clock circuit pack. If not, 
replace the standby Tone-Clock circuit pack. Se
the Tone-Clock Circuit Pack in the TONE-BD section. If this clears 
the error, the problem has been resolved.
5. Replace the EI circuit pack for the active PNC. In the direct-connect 
case, use the list fibers command to identify which active EI 
connects with the PPN.
6. If the problem is still not cleared, and the Tone-Clock circuit pack 
reported in the error log has not been replaced up to now, replace 
it. See 
section.
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
SAKI 
Reset Test for example, you may also clear errors generated from other tests in 
the testing sequence.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
Reset Board 
Sequence
D/ND
1
SAKI Reset Test (#53) (a)
X
D
Clock Health Test (#46) (b)
X
X
ND
Control Channel Looparound Test (#52) 
(a)
X
X
ND
Tone Generator Crosstalk Test (#90) (c)
X
ND
Tone Generator Transmission Test (#40) 
(c) 
X
X
ND
Tone Generator Audit/Update Test (#41) 
(c)
X
X
ND
TDM Bus Clock Circuit Status Inquiry 
Test (#148)
X
X
ND
TDM Bus Clock Slip Inquiry Test 
(#149)(e)
X
X
ND
TDM Bus Clock PPM Inquiry Test (#150)
X
X
ND