SharkRack 45U User Manual

Page of 46
SharkRack Enclosure Installation Guide 
ID-00210-000 
REV D, ECO2773 
Page 25 of 46 
 
How to Remove or Install a Top Panel 
 
Step Detail 
The Top Panel can be removed. 
To remove a Top Panel: 
1. Unlock the Top Panel using the key. 
2. With the key turned in the unlocked position, lift up until 
you can grab the top panel with your free hand. 
 
Note: If using a grounding kit, remove the cable prior to 
lifting the panel from the Cabinet Frame.  See “Installing 
a Grounding Kit” for details. 
 
3. Remove the Top Panel and set aside. 
 
To install a Top Panel: 
1. Set the Top Panel on the top of the Cabinet Frame. When 
installed properly it should sit flush with the rest of the 
cabinet  
2. Lock the Top Panel using the key, if preferred. 
 
 
Figure 25 
42U X 37DP Cabinet Shown