Cal Spas Inground Spa User Manual

Page of 40
2009 Inground Spas
LTR20091002, Rev. A
Pr
eparing f
or 
Your Ne
w Ingr
ound Spa
www.calspas.com
13
Connecting Plumbing to Remote 
Equipment
Connecting the plumbing from the spa to the equip-
ment pack must be performed in accordance to local 
and city codes.
NOTE: Most codes require plumbing to be rigid PVC 
schedule  40  or  heavier  in  both  above  and  below 
ground installations. In most cases, the use of flexible 
PVC plumbing is acceptable when properly buried in 
trenches.
Most water plumbing lines are 2” or larger and must 
be schedule 40 or heavier PVC. When plumbing, mini-
mize the use of 90˚ elbows as much as possible. The 
use  of  45  ˚  elbows  will  increase  the  amount  of  jet 
pressure you will have over the use of 90˚ elbows. 
The plumbing on the spa shell is labeled by the factory 
in the following manner:
Pump  1  Suction:  2”  line  that  connects  the  spa  filter 
and bottom drain assembly to the front of pump 1.
Pump 1 Return: 2” line that connects the top of pump 
1,  through  the  equipment  filter  and  heater  back  to 
selected jets in the spa.
Pump  2  Suction:  2”  line  that  connects  the  spa  filter 
and bottom drain assembly to the front of pump 2.
Pump 2 Return: 2” line that connects the top of pump 
2 back to selected jets in the spa.
Ozone Line: 1” line that connects to a 1” flexible line 
extending off the bottom of the equipment pack filter 
canister through an ozone injector (If ozone equipped) 
and connected to ozone port on the spa.
Air Blower: 1 1/2” line that is plumbed out of the air 
blower (located on the equipment pack) and extended 
up 18” above the spas water level to prevent water 
flooding the air blower.
Air Venturi: 1/2” line that is plumbed 18” above the 
spa’s water level. 
Topside Control Panel and Temp Sensor: 1” line that 
connects to the bottom of the control box located on 
the equipment pack.
Electrical and Electronic Con-
nection
Remote Equipment Topside Control 
Panel
The next few steps to complete the installation should 
be performed along with installation of the tempera-
ture sensor and 12V spa light wiring (if applicable). All 
of these components are generally installed using the 
same conduit. 
Locate  the  topside  control panel extension  loom 
1. 
in  the  control  box  mounted  with  the  equipment 
pack. This extension loom and attached black ter-
minal connector (see figure at right) will be used 
to connect the topside control panel to the control 
box.
Connect one end of the black terminal connector 
2. 
to the topside control panel cable.
Connect the other end of the terminal connector 
3. 
to the extension loom.
NOTE: This connection must be kept dry. We recom-
mend that a waterproof junction box be used in instal-
lations where moisture could penetrate this terminal 
connector. 
Lay out the extension loom to verify that you have 
4. 
enough length to reach the control box. Remem-
ber that conduit runs are not generally run in a 
straight  line.  Every  bend,  and  up  and  down  run 
consumes line length. Take this into consideration 
when verifying electrical and plumbing runs.
Connect the extension loom to the control panel 
5. 
location  on  the  circuit  board  located  inside  the 
control  box.  You  will  also  need  to  connect  both 
the temperature and high limit sensors to the cir-
cuit board prior to testing. (See the temperature 
and high limit installation instruction on the next 
page for proper identification and see the wiring 
diagram on the inside cover of the control box for 
proper placement.) 
Turn on the power supply to the spa equipment 
6. 
and briefly test all functions on the topside control 
panel to verify that both connections and exten-
sion loom are in working order before proceeding 
with the installation.
NOTE: Circuit board programming will not allow spa 
operation  without  both  the  temperature  and  high 
limit sensors being properly connected to the circuit 
board.