APC PDPM150G6F User Manual

Page of 28
7
150/175kw Modular PDU Installation
Install Input Power Cables
Top entry installation
1 Open the front door. Unlatch and swing the display 
interface and bracket out towards the front door. 
2 Loosen the captive screws and remove the top 
safety panel.
3 Loosen the captive screws and remove the front top 
plate. 
4 Remove the dedicated cover plate. 
Drill holes in the plate for conduits 
and re-install the plate with the 
conduits installed. 
5 Connect the input power cables.
For PDPM150L6F:
L1, L2, L3 - Torque: 28.3 Nm 
(250 lb-in). 
Ground - Torque: 5.6 Nm (50 lb-in). 
For PDPM150G6F and 
PDPM175G6H:
L1, L2, L3 - Torque: 31.1 Nm 
(275 lb-in). 
Ground - Torque: 5.6 Nm (50 lb-in). 
6 Grounding Electrode Conductor - 
Torque: 62.2 Nm (550 lb-in).
p
d
x0
830
a
1
2
3
Input Power  
p
d
x
0
84
7a
L1
L2
L3
4
5
5
6