APC PDPM150G6F User Manual

Page of 28
150/175kw Modular PDU Installation
16
Options
Shielding Troughs
1 Snap an APC-provided trough into slots on the roof of the PDU. The tabs at the base of the trough must 
fit securely into the slots. 
Note: Properly align the PDU trough with troughs installed on top of the enclosures located adjacent to 
the PDU.
2 Feed PDM cables through the roof of the PDU and into the trough system for connection with the 
appropriate rack-mount PDUs. 
pd
x
0
84
4a
1
p
d
x
0
8
4
5
a
2