Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Upgrading R5si/R6si to R8r EPN and Adding Memory 
3-50
Release 5/6si to Release 8r 
3
Install Front Ground Plates (Systems with
Earthquake Protection)
Use 1 front ground plate between 2 
stacked cabinets.
1. At the front of the cabinets, align the holes in the top of the front ground 
plate with the holes at the bottom of the upper cabinet, and insert the 4 
screws. Do not tighten the screws yet. Se
2. At the front of the cabinets, align the holes in the bottom of the front 
ground plate with the holes at the top of the lower cabinet. Insert the 4 
supplied #12-24 x 1/2-inch (1.27 cm) thread-forming screws. Do not 
tighten the screws yet.
3. Repeat Steps 1 and 2 until all stacked cabinets are fastened together.
4. Tighten all screws securely.
Figure 3-17.
Rear Ground Plate and Front Plate or Cabinet Clip 
 
Side View
Figure Notes
1. Front Ground Plate or Cabinet Clip
2. Battery
3. Rear Ground Plate
3
2
1
grdpltec LJK 031096