Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-15
Standard Reliability 
5
Standard Reliability 
Required Hardware
The equipment in 
 must be on-site before the upgrade begins. To place 
a claim for missing equipment, as part of the Streamlined Implementation 
process, call 1-800-772-5409, or the number provided by your Lucent 
Technologies representative.
Table 5-6.
Required Hardware
Equipment
Description
Quantity
PEC 6300-05X
Processor Port Network
1
J58890AF-1
Expansion Control Carrier
1
106647985
TN775B Maintenance
 1
103557294
or
103281788
TN776 Expansion Interface
TN570 Expansion Interface
2 or 6 
1
2 or 6 
1,2
1.
Depending on the number of Release 8 EPNs. Two are required for a standard 
reliability system with 2 port networks; 6 with 3 port networks. Either 1 or 4 Expansion 
Interfaces (EIs) are shipped loose with the EPN equipment. The factory has installed 
either 1 or 2 EIs in the new PPN.
2.
Required port network interfaces in a Release 8 system with the optional packet bus.
407439975
20-Foot Multi-mode Fiber Optic Cable
1 or 3 
3
3.
Depending on the number of DEFINITY ECS Release 8 EPNs. Two or 6 are required 
if the PPN and EPN(s) are remotely located. Assuming acceptable lengths, the fiber 
that previously connected an upgraded G2 universal module (not a traditional 
module) to the G2 TMS has the correct transceiver connectors and can be reused.
106455348
or
106455363
9823A Lightwave Transceiver
9823B Lightwave Transceiver
2 or 6 
4
2 or 6 
5
4.
One pair for each fiber connection. For each connection, either 1 lightwave 
transceiver is installed in an EPN and 1 in the PPN. A transceiver can be reused from 
each upgraded G2 universal module. Additional transceivers, ordered separately, 
are also shipped loose with the EPN equipment.