Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-23
Install a New EPN Cabinet in an Existing System 
6
Connect Power and Ground 
1. For an AC- or DC-powered system, connect power and ground to the 
cabinet as instructed in 
DEFINITY Enterprise Communications Server 
Release 8 Installation and Test for Multicarrier Cabinets.
2. Connect the approved ground to the new cabinet as instructed in 
DEFINITY Enterprise Communications Server Release 8 Installation and 
Test for Multicarrier Cabinets.
NOTE:
Do not power up the system until all power and ground connections 
are completed. 
Interconnect Cabling Release 8r 
For fiber optic cabling information and comcode numbers, refer to 
DEFINITY 
Enterprise Communications Server Release 8 Installation and Test for Multicarrier 
Cabinets. The fiber connections installed in this section are later administered 
using the fiber link administration instructions in 
NOTE:
Use multi-mode fiber transceivers and fiber optic cables between cabinets 
unless single-mode is required for distance restrictions. 
Direct-Connect New EPN to Existing PPN
(Standard Reliability)
Figure 6-14.
Rear of J58890AH Control Carrier (PPN)
0063_0 RBP 071096
9
8
7
6
5
4
3
2
1
P1
P2
TERMINAL
DUPLICATION
OPTION
TERMINAL
PROCESSOR
INTERFACE
DATA
COMMUNICATION
EQUIPMENT
AUX
CLOCK