Lucent Technologies 555-233-115 User Manual

Page of 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-24
Install a New EPN Cabinet in an Existing System 
6
1. Install a 9823A lightwave transceiver onto Slot 1 on the rear of the PPN 
Control Carrier. See 
.
2. Connect a 20-foot fiber optic cable to the TX and RX connectors on the 
transceiver. Label the cable to make the connections to the EPN cabinet 
easier. 
3. Route the fiber cable to the J58890AF Expansion Control Carrier in the 
EPN cabinet.
4. On the rear of the EPN Expansion Control Carrier, install a 9823A 
lightwave transceiver onto Slot 2. 
5. Connect the 20-foot fiber optic cable from the PPN Control Carrier to the 
TX and RX connectors on the transceiver on the EPN Expansion Control 
Carrier. Be sure the cable connected to the TX connector on the PPN 
transceiver is connected to the RX connector on the EPN transceiver and 
vice versa.
Direct-Connect New EPN to Existing PPN (High
or Critical Reliability) 
1. On the rear of the Duplicated Control Carrier, install a 9823A lightwave 
transceiver onto Slot 1. 
2. Connect a 20-foot fiber optic cable to the TX and RX connectors on the 
transceiver. Label the cable to make the connections to the EPN cabinet 
easier. 
3. Route the fiber cable to the J58890BB Port Carrier in position C in the EPN 
cabinet.
4. On the rear of the Port Carrier, install a 9823A lightwave transceiver onto 
Slot 2. 
5. Connect the 20-foot fiber optic cable from the PPN Duplicated Control 
Carrier to the TX and RX connectors on the transceiver on the EPN Port 
Carrier. Be sure the cable connected to the TX connector on the PPN 
transceiver is connected to the RX connector on the EPN transceiver and 
vice versa.