Upgrading G3rV2, V3, V4 to R8r and Adding Memory 
1-11
Upgrade the software and hardware 
1
Check the active tone-clock (H/C only)
1. Type status port-network 1 and verify that the Tone-Clock is in the same 
carrier as the active SPE and that the 
Service State
 field shows in.
NOTE:
This takes 1 minute to complete. If the service state is incorrect, 
repeat the command until this condition is met.
If the active Tone-Clock has not migrated to the active carrier after 
1 minute, then a Tone-Clock problem exists. Refer to the TDM-CLK 
Maintenance Objects section of the 
DEFINITY Enterprise Communications 
Server Release 8 Maintenance for R8r book to resolve any problems.
Power Down the Processor Carrier
!
CAUTION:
Do not power down the whole cabinet; it is not necessary.
For standard reliability, power down the processor carrier. This causes a service 
interruption.
For high or critical reliability, power down the standby carrier.
1. To power down the processor carrier, remove the power plug from the 
left 
side of the carrier then remove the power plug from the right side of the 
carrier. 
Remove the Circuit Packs
NOTE:
More detailed information on removing and adding circuit packs is in 
.
1. Remove the blank faceplate next to the MSSNET slot in the carrier.
2. Remove the UN332B circuit pack from the carrier and place it in antistatic 
packing material.
3. Remove the tape from the tape drive.