Fiber Link Administration 
A-7
Administer Fiber Links 
A
T1 Installations Only
1. The 
Framing Mode:
 field is display only and shows the hardware setting.
2. The 
DS1CONV-1 Line Compensation:
 and the 
DS1CONV-2 Line 
Compensation:
 fields are display only and show the hardware setting. 
3. In the 
Facility A Circuit ID:
 field, enter an optional facility name 
that is unique to each facility (up to 40 alphanumeric characters). Press 
Enter
.
4. A display similar to the following appears after the fiber link administration 
is completed: 
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.
E1 Installations Only
1. Type y or n in the 
CRC?
 field. The “CRC” means Cyclic Redundancy 
Check. This is an error detection algorithm.
2. The 
Line Termination:
 field is display only. A 75 (75 Ohms) or 120 
(120 Ohms) typically displays.
3. In the 
Facility A Circuit ID:
 field, enter an optional facility name 
that is unique to each facility (up to 40 alphanumeric characters). Press 
Enter
.
4. A display similar to the following appears after the fiber link administration 
is completed: 
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.
All Installations
1. When the system reset is finished, type status port-network 2 and press 
Enter
. The Port Network Status screen appears. Verify that PNC Active is 
“up” and that the Service State is “in.” 
2. A Span LED, on the front of the DS1 Converter circuit pack, must be on for 
each active facility administered. For example, if Facility A and Facility B 
are administered, then the top 2 Span LEDs on the circuit pack must be on 
(yellow). The yellow LEDs are on only if no problems were encountered 
during the administration of hardware. Span LEDs associated with 
non-administered facilities (C and D, in this example) should be off.
3. Perform a test call, if desired.