Empire Comfort Systems FD42FB2DF-1 User Manual

Page of 20
Page 5
23200-0-1206
Deluxe Vent-Free Firebox Framing Dimensions (in inches)
"A"
"B"
"C"
Model
Framing Height
Framing Width
Framing Depth
VFD32FB
36 1/8"
35"
17"
VFD36FB
38 1/8"
40"
19 3/8"
VFD42FB
38 1/8"
44"
19 3/8"
Attention: Add 3-3/4" to "A" Dimension when using flush mantel base.
Framing dimension A includes a three inch clearance for standoffs on firebox.
Accessory kits such as the FBB5 Blower kit, Trim kits, Mantles, 
Full Cabinet Mantels, plus other Decorative Frame, Hood, and 
Door accessory kits may be installed after the firebox is secured 
to the framed opening.
Refer  to  the  instructions  provided  with  each  of  the  optional 
accessory kits for proper installation and operation.
Firebox Framing
Firebox  framing  can  be  built  before  or  after  the  firebox  is  set 
in  place.  Framing  should  be  positioned  to  accommodate  wall 
covering and firebox facing material. The firebox framing should 
be constructed of 2 x 4 lumber or heavier. The framing headers 
may rest on the top of the firebox standoffs. Refer to Figures 6 
and 7 for firebox framing dimensions.
The firebox can be mounted on any of these surfaces:
1.  A flat hard combustible or non-combustible surface.
2.  A  raised  platform  of  combustible  or  non-combustible 
material.
3.  Recessed into the floor as illustrated by Figure 4 (flush face), 
and Figure 5 (louvered models).
4.  Supported under all (4) corners of the firebox so that contact 
is made on all four perimeter edges on the bottom of the unit 
(Example: Four (4) concrete masonry blocks).
If  the  firebox  is  installed  directly  on  carpeting,  tile  or  other 
combustible material other than wood flooring, it should be installed 
on a metal or wood panel extending the full width and depth of 
the unit.
At this point, you should have decided what components to include 
in your installation, and where the firebox is to be located. If this 
has not been done, stop and consult your dealer for assistance with 
this planning.
Planning Your Installation
Please note that the optional BVA1 Fresh Air kit available for use 
with the Vent Free Firebox must be installed at the time of the initial 
installation. Refer to pages 9, 10, and 11 for detailed instructions 
for the air kit.
COMBUSTIBLE MATERIALS ALLOWED
NON-COMBUSTIBLE
FINISHING MATERIAL
TO FIREBOX OPENING
FLUSH
FACE
MODELS
LOUVERED
FIREBOX
MODELS
COMBUSTIBLE MATERIALS ALLOWED
Figure 4
Figure 5
Figure 6