Vertical Through the Roof Applications (Figure 62)
Your Gas Fireplace has been approved for:
a)  Vertical installations up to 40 feet in height.
b)  Two  sets  of  45  degree  elbow  offsets  within  these  vertical 
installations. From 0 to a maximum of 8 ft. a vent pipe can be 
used between elbows.
c)  Wall straps must be used to support offset pipe every 4'. 
This application will require that you first determine the roof pitch 
and use the appropriate venting components.
Figure 62
Figure 61
CAUTION:  Treatment  of  firestop  spacers  and  construction  of 
the chase may vary with the type of building. These instructions 
are not substitutes for the requirements of local building codes. 
Therefore, your local building codes must be checked to determine 
the requirements for these steps.
NOTE: When installing this vent system in a chase, it is always 
good  building  practice  to  insulate  the  chase  as  you  would  the 
outside walls of your home. This is especially important for cold 
climate  installations.  Upon  completion  of  building  your  chase 
framing, install the vent system by following the instructions in 
this manual. Remember to build the chase large enough so that 
minimum clearance of combustible materials (including insulation) 
to the vent system are maintained.
Reassembly and Resealing Vent Pipe System
Attach  vent  pipe  to  inlet  and  outlet  vent  adaptor  on  fireplace, 
replace horizontal and vertical pipe lengths, elbows and horizontal 
or vertical termination kit.
All vent system components lock into place by sliding the concentric 
pipe section with four (4) equally spaced interior beads onto the 
appliance collar or previously installed component end with four 
(4) equally spaced indented sections. When the internal beads of 
each starting outer pipe line up, rotate pipe section clockwise 90° 
(approximately 3 inches). The vent pipe is now locked together.
Continue replacing components per the vent system configuration. 
Be certain that each succeeding vent component is securely fitted 
and locked into the preceding component in the vent system.
Reassembly and Resealing Gas Accumulation Relief System
Glass Frame Assembly and Combustion Chamber
Whenever the glass frame assembly  is pivoted open by a delayed 
ignition in the main burner, the glass frame assembly gaskets and 
combustion chamber must be examined by a qualified service person 
for damage. All damaged gaskets on the glass frame assembly and 
combustion chamber must be replaced by a qualified service person. 
If damage occurs to the combustion chamber, it must be replaced 
by a qualified service person. Contact Empire Comfort Systems, 
Inc. for replacement parts.
TYPICAL ROOF
SUPPORT
TYPICAL JOIST
SUPPORT
40’
(12.19M)
MAXIMUM
8’ (2.44M)
MAXIMUM
8’ (2.44M)
MAXIMUM
45°
45°
VERTICAL TERMINATION (continued)
FEMALE
LOCKING
LUG
MALE
LOCKING
LUG