Soleus kfihp-09 User Manual

Page of 26
 
- 16 -
 
 
 
               
Install the Outdoor Unit 
 
 
•  Air Purging and Leakage Test 
1.  Remove the flare nuts of charging end from gas valve. 
2.  Connect the charging hose in the middle to the vacuum 
pump, then Low-pressure (Lo) end should be connected 
to charging end of gas valve. (Shown in Fig. 9) 
3.  Open the vacuum pump to evacuate.  When multi-meter 
indicates 1 bar, fully tighten Lo handle of manifold valve 
and stop evacuation. Keep it for over 15 minutes to ensure 
the pressure is constant. 
4.  Remove bonnets of gas and liquid valve. 
5.  Slightly loosen core of liquid valve with hexagon wrench 
until the pressure exceeds 0 bars. 
6.  Remove charging hose from charging end of gas valve and 
screw the flare nuts of charging end. 
7.  Open cores of gas and liquid valve entirely by hexagon 
wrench. 
8.  Tighten the bonnets of gas and liquid valve, and then test 
whether there is any leakage or not.