Trendnet teg-s2500i Installation Guide
3
Power On the Switch:
The
24+2G
Switch has a universal power supply and you can power up the Switch with 90
~ 260V AC, 50 ~ 60Hz power source. The AC power cord connector is located at the rear
of the unit and the On/Off switch is next to the connector. Connect the power cord from
the power outlet to the Switch and push the On/Off Switch to “ON” position to power on
the Switch. After the Switch is powered on, it will perform “self-diagnostic” (POSD). This
process takes about 100 seconds to complete, during this process, the “DIAG” LED will
blink green and the Switch will not response to any configuration program and all the
connections to the Switch will not be available. When the processed is completed, the
“DIAG” LED will stay solid green.
Below is a table that describes the meaning of each LED indicator.
LED indicators information
Status
LED Color
Solid Blinking
Power
Green Power is applied to this device
N/A
DIAG
Green Self diagnostic successful Performing
self
diagnostic (after
Power On)
Power On)
FAN1
Red Left
cooling fan failed
N/A
Cooling
Fans
FAN2
Red
Right cooling fan
failed
N/A
LINK/ACT
(1 ~24 port)
Green
10Mbps Ethernet connection speed
TX/RX activity or
Collision
Collision
Green
100Mbps Fast Ethernet connection
speed
speed
N/A
100M
(1 ~24 port)
Off
10Mbps connection speed
N/A
10/100/1000Mbps Copper Gigabit Port (Optional Module)
Top LED
Orange 100Mbps Fast Ethernet connection
speed (with Middle LED off)
N/A
Middle LED Green 10Mbps Ethernet connection.
(with Top LED off)
N/A
Bottom LED Green N/A
TX/RX activity or
collision
collision
Top+Middle
LEDs
Orange
+ Green
1000Mbps Gigabit connection speed
N/A
Initial set up for management
There are two ways to perform the initial setup for the Switch; one is “Out-of-Band