Trendnet teg-s2500i  Installation Guide

Page of 6
Power On the Switch: 
 
The 
24+2G 
Switch has a universal power supply and you can power up the Switch with 90 
~ 260V AC, 50 ~ 60Hz power source. The AC power cord connector is located at the rear 
of the unit and the On/Off switch is next to the connector. Connect the power cord from 
the power outlet to the Switch and push the On/Off Switch to “ON” position to power on 
the Switch. After the Switch is powered on, it will perform “self-diagnostic” (POSD). This 
process takes about 100 seconds to complete, during this process, the “DIAG” LED will 
blink green and the Switch will not response to any configuration program and all the 
connections to the Switch will not be available. When the processed is completed, the 
“DIAG” LED will stay solid green. 
Below is a table that describes the meaning of each LED indicator. 
LED indicators information 
 
Status 
LED Color 
Solid Blinking 
Power 
Green  Power is applied to this device 
N/A 
DIAG 
Green  Self diagnostic successful Performing 
self 
diagnostic (after 
Power On) 
FAN1 
Red Left 
cooling fan failed
 N/A 
 
Cooling 
Fans
 
FAN2 
Red 
Right cooling fan
 
failed
 N/A 
LINK/ACT 
  (1 ~24 port) 
Green 
10Mbps Ethernet connection speed 
TX/RX activity or 
Collision 
Green 
100Mbps Fast Ethernet connection 
speed 
N/A 
 
100M 
(1 ~24 port) 
Off 
10Mbps connection speed 
N/A 
 
10/100/1000Mbps Copper Gigabit Port (Optional Module) 
Top LED 
Orange  100Mbps Fast Ethernet connection 
speed (with Middle LED off) 
N/A 
Middle LED  Green  10Mbps Ethernet connection. 
(with Top LED off) 
N/A 
Bottom LED  Green  N/A 
TX/RX activity or 
collision 
Top+Middle 
LEDs 
Orange
+ Green 
1000Mbps Gigabit connection speed 
N/A 
 
Initial set up for management 
 
There are two ways to perform the initial setup for the Switch; one is “Out-of-Band