Bunn FMD-4 User Guide

Page of 46
21
SERVICE (cont.)
16.  Reconnect    the  ten  pin  connector  of  the  wiring 
harness to J2 of control board #1.
17. Gently pull the liquid level probe out of the tank lid 
and inspect for corrosion. Replace it if necessary.
18. Place the probe so that neither end is in contact 
with any metal surface of the dispenser.
19.  Check  the  voltage  across  the  terminals  of  the 
inlet solenoid valve with a voltmeter. Connect the 
dispenser  to  the  power  source.  The  indication 
must again be 120 volts ac for two wire 120 volt 
models, three wire 120/208 volt models, three wire 
120/240 volt models, or 230 volts ac for two wire 
230 volt models after a delay of approximately 10 
seconds.
20. Move the probe’s flat end to the dispenser housing. 
The indication must be 0.
21. Move the probe’s flat end away from the housing.  
The indication must again be 120 volts ac for two 
wire  120  volt  models,  three  wire  120/208  volt 
models, three wire 120/240 volt models, or 230 
volts ac for two wire 230 volt models after a delay 
of approximately 5 seconds.
22. Disconnect the dispenser from the power source.
If  the  voltage  is  present  as  described,  re-install  the 
probe.  The  liquid  level  control  circuitry  is  operating  
properly.
If the voltage is not present as described, check the pink 
probe wire and green tank wire for continuity.
CONTROL BOARD (CONT.)
Hopper Motor Control Circuitry (Stations 1-3, Control 
Board #1 & Stations 4-5, Control Board #2):
1.  Disconnect the dispenser from the power source.
2.  Disconnect the six pin connector from J3 of the 
appropriate control board.
3.   Check the voltage across pins 5 & 6 of  the six pin 
connector on the wiring harness with a voltmeter. 
Connect the dispenser to the power source. The 
indication must be 24 volts ac.
4.   Disconnect the dispenser from the power source.
If voltage is present as described, proceed to step 5.
If voltage is not present as described, refer to the wiring 
diagram and check the dispenser wiring harness.
5.   Reconnect  the six pin connector of the wiring har-
ness to J3 of the control board.
6.   Check that the rinse/run switch is in the run posi-
tion.
7.   Check the voltage across the red (+) terminal  and 
the black (-) terminal of the auger motor with a volt-
meter. Connect the dispenser to the power source. 
Press and hold the appropriate dispense switch.  
After a delay of about .6 seconds, the indication 
must be between +4.0 and +24.5 volts dc.
If the voltage is present as described, the hopper motor 
control circuitry is operating  properly.
If the voltage is not present as described, replace the 
control circuit board.
35135 100407