Bunn FMD-4 User Guide

Page of 46
23
Test Procedure:
1.  Disconnect  the  dispenser  from  the  power 
source.
2.  Open the dispenser door and remove the bottom 
door cover.
3.  Disconnect  the  wires  from  the  door  intercon-
nect wiring harness to the dispense switch to be 
tested.
4.  Check for voltage across the black and red/white 
wires for the dispense switch to be teseted from 
the  door  interconnect  wiring  harness.  Connect 
the dispenser to the power supply. The indication 
must be:
 
a) 120 volts ac for two wire 120 volt models.
 
b)  120  volts  ac  for  three  wire  120/208  volt  or 
120/240 volt models.
 
c) 230 volts ac for two wire 230 volt models.
 
5.  Disconnect  the  dispenser  from  the  power 
source.
If voltage is present as described, proceed to #6.
If  voltage  is  not  present  as  described,  refer  to  the 
wiring diagram and check the dispenser wiring har-
ness.
6.  With  a  voltmeter,  check  the  voltage  across  the 
remaining two wires of the dispense switch being 
tested from the door interconnect wiring harness. 
Connect the dispenser to the power source. The 
indication must be +5 volts dc.
If voltage is present as described, proceed to #7.
If voltage is not present as described, refer to the wiring 
diagram and check the dispenser wiring harness.
DISPENSE SWITCH(S) - FMD-4 & FMD-5
FIG.13 DISPENSE SWITCHES
P2636
Location:
 
The dispense switches are located on the lower 
outside of the dispenser door.
FMD-4
FMD-5
SERVICE (cont.)
35135 100407