1.4 SUBMITTALS 
A. 
Product Data:  Submit product data showing material proposed. Submit sufficient 
information to determine compliance with the Drawings and Specifications. Product data 
shall include, but shall not be limited to, the following: 
1. 
As bid system bill of materials. 
2. 
Product catalog sheets or equipment brochures. 
3. 
Product guide specifications. 
B. 
Shop Drawings:  Submit shop drawings for each product and accessory required. Include 
information not fully detailed in manufacturer’s standard product data, including, but not 
limited to, the following: 
1. 
Installation information, including, but not limited to, weights and dimensions. 
2. 
Information about terminal locations for power and control connections. 
3. 
Drawings for requested optional accessories. 
C. 
Wiring Diagrams:  Submit wiring diagrams detailing power systems, clearly differentiating 
between manufacturer-installed wiring and field-installed wiring, and between components 
provided by the manufacturer and those provided by others. 
1. 
Submit system single-line diagram. 
D. 
Operation and Maintenance Data:  Submit operation and maintenance data to include in 
operation and maintenance manuals including, but not limited to, safe and correct operation 
of UPS functions. 
1. 
Submit an installation manual, which shall include, but shall not be limited to, 
instructions for storage, handling, examination, preparation, installation, and start-up of 
UPS. 
2. 
Submit an operation and maintenance manual, which shall include, but shall not be 
limited to, operating instructions. 
 
1.5 QUALITY 
ASSURANCE 
 
A. 
Qualifications: 
1. 
Manufacturer Qualifications:  Manufacturer shall be a firm engaged in the 
manufacture of modular PDUs of types and sizes required, and whose products have 
been in satisfactory use in similar service for a minimum of 20 years. 
a.  The manufacturer shall be ISO 9001 certified and shall be designed to 
internationally accepted standards. 
 
B. 
Regulatory Requirements:  Comply with applicable requirements of the laws, codes, 
ordinances, and regulations of Federal, State, and local authorities having jurisdiction.  
Obtain necessary approvals from such authorities. 
1. 
Work shall also be designed in accordance with the following: 
a. NFPA 
70 
2. 
Where applicable, the UPS shall also be designed in accordance with publications 
from the following organizations and committees: 
a.  National Fire Protection Association (NFPA). 
b.  National Electrical Manufacturers Association (NEMA). 
c.  Occupational Safety and Health Administration (OSHA). 
d.  Institute of Electrical and Electronics Engineers, Inc. (IEEE); ANSI/IEEE 519. 
e. ISO 
9001 
f. ISO 
14001 
g. FCC 
 
1.6  DELIVERY, STORAGE, AND HANDLING 
 
A. 
Deliver materials to the Project site in supplier’s or manufacturer’s original wrappings and 
containers, labeled with supplier’s or manufacturer’s name, material or product brand 
name, and lot number, if any. 
 
 