Netgear GSM7252PS - ProSAFE 52 ports Gigabit Ethernet L2 Managed Stackable Switch with PoE Hardware Manual

Page of 39
  Chapter 1:  Introduction    
|
    
7
Managed Stackable Switches GSM7200PS and GSM7300S Series Hardware Installation Guide
10/100/1000M Ports 
(2 LEDs per port) 
SPD/Link/ACT LED:
• 
Off: No link is established on the port.
• 
Solid green: A valid 1000 Mbps link is established on the port.
• 
Blinking green: The port is transmitting or receiving packets at 1000 Mbps.
• 
Solid yellow: A valid 10 Mbps or 100 Mbps link is established on the port.
• 
Blinking yellow: The port is transmitting or receiving packets at 10 Mbps or 
100Mbps.
PoE Status LED:
• 
Off: No PoE powered device (PD) is connected.
• 
Solid green: The PoE powered device (PD) is connected and the port is 
supplying power.
• 
Solid yellow: Indicates one of the following failures stopped power to that port:
– Short circuit on PoE power circuit.
– PoE power demand exceeds power available.
– PoE current exceeds PD's classification.
– Out of correct voltage band (44 ~ 57 VDC for af, 50~57 VDC for at).
Combo Ports
(1Link/ACT LED per 
port) 
• 
Off: No SFP module link is established on the port. 
• 
Solid green: A valid 1000 Mbps SFP module link is established on the port. 
• 
Blinking green: The port is transmitting or receiving packets at 1000 Mbps.
• 
Solid yellow: A valid 100 Mbps SFP module link is established on the port.
• 
Blinking yellow: The port is transmitting or receiving packets at 100 Mbps.
Note: If port 21–24 media is changed to copper, the SFP LEDs change to Off status. 
SFP+ Ports
(1 Link/ACT LED per 
port)
• 
Off: No SFP module link is established on the port.
• 
Solid green: A valid 10 Gbps SFP+ module link is established on the port.
• 
Blinking green: The port is transmitting or receiving packets at 10 Gbps.
Table 1-2.  GSM7228PS Port PoE Power Specification
Port
Power Range
1-8
0w - 30w
9-24
0w - 15.4w
Table 1-1.  LED Descriptions for GSM7228PS  (Continued)
LED
Description