APC Smart-UPS 8000VA Online 230V Ext Batt SUDP8000IX194 User Manual

Product codes
SUDP8000IX194
Page of 24
990-1007A, Revision 2  9/99
11
UPS
N
L
N
L
INPUT
CABLE
SBP
MAINS
L
N
PE
LOAD
L
N
OUTPUT
CABLE
SBP
SBP
L
N
L
N
Input
cable
UPS
Output
cable
UPS
Fm
Fo
1  2  3  4
MBS CONTROL
SBP
CABLE
X010
1  2  3  4
External Service Bypass Panel and Galvanic Isolation Transformer
If both the external service bypass panel and the galvanic isolation transformer are installed, the following connections
must be made:
• If the cables in the galvanic isolation transformer have 4 wires, the wire marked no. 3 must be cut off.
• If Smart-UPS DP has an ohm load, then it is necessary to ensure the system with 20A. In this case, an external
manual bypass switch which is supplied with a 32A CEE plug, should be used. The switch can ensure both 20A
and 32A fuses.
SBP and Galvanic Isolation Transformer Connections
Standard System With Isolating Transformer (230 V) And SBP
System
Mains Fuse*
(Fm)
Input Cable
Transformer
Input Cable SBP
Input Cable UPS
4kV
25A
3x6 mm²
3x6 mm²
3x6 mm²
6kV
40A
3x10 mm²
3x10 mm²
3x10 mm²
8kV
50A
3x16 mm²
3x16 mm²
3x16 mm²
10kV
63A
3x16 mm²
3x16 mm²
3x16 mm²
*Din gl Types
System
Output Cable UPS
Output Fuse SBP (Fo)
Output Cable SBP
4kV
3x4 mm²
20A
3x4 mm²
6kV
3x10 mm²
32A
3x10 mm²
8kV
3x10 mm²
40A
3x10 mm²
10kV
3x16 mm²
50A
3x16 mm²
MAINS
L
N
PE
Input
Cable Tr.
Iso.Tr
.
L
N
Tr. Sw. cable
L
N
UPS
N
L
N
L
INPUT
CABLE
SBP
LOAD
L
N
OUTPUT
CABLE
SBP
SBP
L
N
L
N
Input
cable
UPS
Output
cable
UPS
1  2  3  4
MBS CONTROL
SBP
CABLE
X010
1  2  3  4