3com superstack ii hub 10 User Manual

Page of 8
 
Siting the Hub 10 Telco
 
CAUTION:
 
 When installing the Hub 10 Telco in a stack with 
 
FMS units, the Hub 10 Telco must be installed beneath any FMS 
 
units.
 
When deciding where to site the Hub 10 Telco ensure:
 
It is accessible and cables can be connected easily.
 
Cabling is away from:
 
sources of electrical noise such as radios, transmitters and 
 
broadband amplifiers.
 
power lines and fluorescent lighting fixtures.
 
Water or moisture cannot enter the case of the unit.
 
Air flow around the unit and through the vents in the side of the 
 
case is not restricted (3Com recommend that you provide a 
 
minimum of 25mm (1 inch) clearance).
 
To prolong the operational life of your units:
 
Never stack units more than eight high if free standing.
 
Do not place objects on top of any unit or stack.
 
Do not obstruct any vents at the sides of the case.
 
Rack or Wall Mounting
 
The Hub 10 Telco can be mounted in a 19 inch equipment rack or else 
 
wall-mounted using the LinkBuilder Rack Mounting Kit. See 
 
 
 
 
 
 overleaf.
 
Stacking Units
 
The Hub 10 Telco can be linked to other Hub 10 units to form a stack, or 
 
can be part of a mixed stack consisting of Hub 10, FMS, FMS II, 10BT or 
 
10BTi units. 
 
Different rules apply on stacking units if the stack only consists of Hub 
 
10 and/or FMS II units compared to a stack with other mixed units.
 
Hub 10/FMS II only stacks
 
Up to 8 Hub 10 (FMS II) units can be linked together to form a free 
 
standing stack or be mounted in a 19 inch rack, in a managed or 
 
unmanaged configuration. 
 
Only fit a Hub 10 or LinkBuilder FMS II Management Module or 
 
Advanced RMON Module, to either the unit at the top or bottom of the 
 
stack.
 
Mixed stacks of Hub 10/FMS II/FMS/10BT/10BTi
 
Link up to 8 units in a free standing stack or mounted in a rack. But any 
 
FMS, 10BT or 10BTi units must be units 1-4 in a managed stack.
 
If mixing Hub 10 (FMS II) and FMS units in a free standing stack, the 
 
narrower FMS units must be positioned at the top of the stack. This 
 
restriction does not apply if rack mounting the units.
 
Stack Management
 
To manage any stack containing a Hub 10 unit, the Management 
 
Module must have the correct version of the agent installed. The table 
 
below details the minimum agent version numbers for each 
 
management module.
 
Check which version you have installed before adding a Hub 10 unit to 
 
your stack.
 
If you need to upgrade your agent, and a disk containing the new 
 
versions is not included in the packaging, a free upgrade is available 
 
from the 3Com bulletin boards (see 
 
 
 
 
). The 
 
upgrade includes instructions on how to load the agent.
 
Managing with an FMS Management Module
 
Managing with a Hub 10 (FMS II) Management 
 
Module (3C16630A) or Advanced RMON Module 
 
(3C16632)
 
If you have a Hub 10, LinkBuilder FMS or FMS II unit fitted with a 
 
Management Module, and a LinkBuilder 10BTi in your stack, the Hub 10, 
 
FMS or FMSII Management Module will manage the stack.
 
The LinkBuilder 10BTi can only manage LinkBuilder 10BT units 
 
and the FMS Telco Hub (3C16271). 10BTi cannot manage other 
 
FMS units or any Hub 10 (FMS II) units.
 
Power Up
 
Use the following sequence to power up the Hub 10 Telco:
 
Check the Disable On Boot switch at the rear and select position 
 
as appropriate: see 
 
15
 
.
 
Check the network connections and cables.
 
Check the hub expansion cables if in a stack.
 
Connect the power supply cable to the appropriate power socket 
 
on the rear panel of the unit, see 
 
11
 
 or 
 
12
 
.
 
Connect the plug to the power supply outlet socket and switch 
 
on the power supply at the socket. If you are using a 3Com 
 
Redundant Power Supply make sure it is switched on.
 
When the Hub 10 Telco is powered up, the Power LED should be lit. If it 
 
is not, refer to 
 
 
 
 
 
9
 
.
 
Spot Checks
 
At frequent intervals you should visually check the Hub10 Telco. Regular 
 
checks can give you an early warning of a possible failure; any problems 
 
can then be attended to when there will be least effect on users. Check 
 
the following:
 
What To Do Next?
 
If the Hub 10 Telco fails to operate successfully, contact your supplier 
 
with the following information before returning the unit:
 
product number
 
serial number
 
a brief description of the fault
 
When returning any equipment to your supplier make sure the 
 
equipment is packed suitably for transit. 
 
3C16030
 
LinkBuilder FMS Management Module 
 
3.04
 
3C16630
 
LinkBuilder FMS II Management Module 
 
3.04
 
3C16630A
 
SuperStack II (FMS II) Management Module 
 
3.14
 
3C16632
 
SuperStack II (FMS II) Advanced RMON Module 
 
1.01
 
rack mounted stacks:
 
the module must be fitted to an FMS unit at 
 
the top or bottom of the stack.
 
free standing stacks:
 
the module must be fitted to an FMS unit at 
 
the top of the stack.
 
rack mounted stacks: 
 
the module must be fitted to a Hub 10 (FMS II) 
 
unit at the top or bottom of the stack. 
 
free standing stacks: 
 
the module must be fitted to a Hub 10 (FMS II) 
 
unit at the bottom of the stack.
 
Cabling
 
Check that all external cabling connections are 
 
secure and that no cables are pulled taut.
 
Cooling fans
 
Check that the cooling fans are operating and are 
 
not obstructed. The fans are fitted to the right 
 
hand side of the unit when viewed from the front.
 
Transceiver Module
 
Check that the Transceiver Module is connected 
 
securely. Refer to the guide provided with the 
 
Transceiver Module.
i