Stellar Industries v480 User Manual

Page of 30
Installation        5
Installation
CompressorInstallation
ComponentInstallation
This section pertains to the installation of the air compressor, PTO, pump and
other related items.  The instructions are intended as a guide to assist you with
particular installation.  These instructions will provide only general information.  
Torque and Procedure Chart
Pulsation Chamber Assembly
Torque Value: 31 FT. LBS.
Procedure: See Head Assembly.
Head Assembly  
Torque Value: 31 FT. LBS.  
Procedure:  Assemble both heads on the cylinders with head bolts started only, not tight.  Set
pulsation chamber in place between heads, making sure the “O” ring is in place in each head.
Screw the (4) chamber mounting bolts down but not tight.  Snug (6) head bolts in each head to
light torque.  Tighten (4) chamber bolts to 31 Ft-lbs. torque.  Tighten (6) head bolts in each head
to 31 Ft-lbs. torque, doing the (2) long center bolts first and the (4) short bolts last.  After five
hours of use re-torque bolts to 31 Ft-lbs. 
Cylinder Assembly  
Torque Value:  20 FT. LBS.  
Procedure:  After assembling cylinder over pistons and setting into place, tighten (6) cap screws
finger tight.  In a criss-cross pattern, tighten bolts evenly so all bolts are hand snug.  Again in a
criss-cross pattern torque each bolt to 20 Ft-lbs., checking each bolt twice.  After five hours of
use, re-torque bolts to 20 Ft-lbs.  
Connecting Rod Assembly  
Torque Value:  18 FT. LBS.  
Procedure:  Assemble rod onto the crankshaft taking care to align the machined surfaces
together and tighten cap screws finger tight.  Tighten bolts until hand tight and torque to 18 Ft-lbs.
Check twice the torque reading before final assembly of the cylinders.