PVI Industries PV 500-6 User Manual

Page of 14
DURAWATT
® 
ELECTRIC WATER HEATER 
 
PV500-6   09/07
 
13
 
 
 
SUPERTANK
 BOLTED HEAD REMOVAL 
 
SUPERTANK
™ water heaters and storage tanks will have one or more removable heads or bolted tank sections. The 
heads are used to mount an energy module (i.e. TURBOPOWER
® 
module, electric elements, QUICKDRAW
®
 or steam or 
water heat exchanger heating elements) or bolted head for access to the tank. If a head or module is removed during the 
course of maintenance, replace the O-ring and all special high quality 9/16”-12 NC, grade 8 bolts, washers and nuts with 
identical parts available from your PVI representative or directly from PVI. Do not reuse or substitute these special 
fasteners with similar grade 8 bolts, washers and nuts.  Install the flange bolts and nuts with a flat washer under each bolt 
head and nut. First, snug them in an alternating star pattern. Then, using a calibrated torque wrench, and in an alternating 
star pattern, tighten the bolts in 2 increments: 95 ft lbs and 145 ft lbs. Use a small amount of silicone RTV to hold the o-
ring in place while positioning the flanged head or heat exchanger. Apply adhesive sparingly! 
 
Contact PVI at 1-800-433-5654 for replacement Fastener Kits and O-Ring Replacement Instructions.   
 
 
IMPORTANT: Mark one hole on head and on tank flange for reference when removing head. Be certain to align these 
holes during reassembly to insure the original gasket or O-ring mating surfaces will be correctly positioned. 
 
 
Typical Vertical SUPERTANK
 Bolted Head Attachment 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FIGURE 13