Bunn CDS-3 User Manual

Page of 34
22
SERVICE (cont.)
FIG. 15 MAIN POWER ON/OFF SWITCH
MAIN POWER ON/OFF SWITCH
P1923
Location:
 
The main power switch is located inside the dis-
penser on the right of the whipper motor mounting 
panel.
Test Procedure:
1.  Disconnect the dispenser from the power source.
2.  Disconnect the black wires  from the main wiring 
harness.
3.  With the switch in the ON (lower) position check 
for continuity  between the  center and the  upper 
terminal. With the switch in the OFF (upper) posi-
tion no continuity should be present between center 
and upper terminals.
If continuity is present as described, the main power 
switch is operating properly.
If continuity is not present as described, replace the 
switch.
FIG. 16 MAIN POWER ON/OFF
SWITCH TERMINALS
P1907
BLK from Power
Cord
BLK from Main
Harness
Removal and Replacement:
1.  Disconnect the dispenser from the power source.
2.  Open the dispenser door and remove the hopper 
assembly out the front of the dispenser.
3.  Remove the four #8-32 screws securing the hopper 
support panel to the auger motor mounting panel 
and the whipper motor mounting panel.
4.  Slowly lift the hopper support panel up and discon-
nect the red/black and green wires from the hopper 
switch.
5.  Remove the switch mounting nut on the front of 
the whipper motor mounting panel.
6.   Remove switch with wires attached from the rear 
of the whipper motor mounting panel.
7.  Remove the wires from the switch terminals and 
discard switch.
8.   Connect the wires to the new switch, refer to Fig. 
16.
9.  Push new switch through hole in the whipper motor 
mounting panel and secure with face nut.
10. Connect the red/black and green wires to the hopper 
switch. See Fig. 10 on page 17.
11. Install the hopper support panel to the auger motor 
mounting panel and the whipper motor mounting 
panel using the four #8-32 screws.
12. Install the hopper assembly.
29793 061599