GE ZTD910 User Manual

Page of 8
6
Design Information
Warming Drawer
Installation
Below
Wall Ovens
When installed under a wall oven:
Warming drawers are approved for installation
below only certain specified wall oven models.
See the label attached to the top of the
warming drawer for approved models.
• When installed, the front face of the drawer
will be nearly flush with adjacent cabinetry
doors.
• Drawer overlaps will conceal cut  edges on all
sides of the opening.
INSTALLATION
BELOW A
SINGLE OVEN
Note:
 Additional clearance between
cutouts may be required. Check to be
sure that oven supports above the
Warming Drawer location does not
obstruct the required interior 23-1/2”
depth and 9-1/4” height.
Note:
 Additional clearance between
cutouts may be required. Check to be
sure that oven supports above the
Warming Drawer location does not
obstruct the required interior 23-1/2”
depth and 9-1/4” height.
Dim.  A
Dim. B
ZKD30
28-1/2”
30”
ZKD27
25-1/2”
26-3/4”
 The rough opening for the drawer must be:
– Depth – 23-1/2” min. from inside back to
front of cabinet frame.
– Width – 25-1/2” for 27” wide models,
28-1/2” for 30” wide models.
– Height - 9-1/4”.
–  Allow 2” min. between oven and drawer
cutouts for clearance of overlaps.
Note: If you are installing in frameless cabinets, it may
be necessary to install 1/2” wide cleats to accept
drawer mounting screws. See drawer for mounting
screw locations.
INSTALLATION
BELOW A
DOUBLE OVEN
1" Min. Above Toekick or Adjust 
to Oven Installation Height
A
2" Min.
Allow 5/8"
Overlap on
All Sides
B
10-1/2"
23-1/4"
23-1/2" Min.
Inside
Oven 
Cutout
9-1/4"
2x2 or 2x4
Anti-Tip Block
Against Rear
Wall, 9" From
Floor to 
Bottom of
Block
9"
A
2" Min.
Allow 5/8"
Overlap on
All Sides
B
10-1/2"
23-1/4"
23-1/2" Min.
Inside
1" Min. Above Toekick 
Oven 
Cutout
2x2 or 2x4
Anti-Tip Block
Against Rear
Wall, 9" From
Floor to 
Bottom of
Block
9"
9-1/4"