Ditch Witch Welder PR95 User Manual

Page of 95
PR95 Operator’s Manual
Prepare - 35
Prepare Jobsite
CMW
Dig Launch and Burster Pits
Dimensions
Requirements
 
Exit Pit (1)
Must be in line with existing pipe.
Sloped back end aids new pipe entry.
Burster Pit (2)
Must be in line with existing pipe.
Must allow burster to be level with existing pipe.
Unit
Burster Pit 
Exit Pit *
Length (A)
Width (B)
Length (C)
Width (D)
U.S. (metric)
U.S. (metric)
U.S. (metric)
U.S. (metric)
PR95
12’ (3.6 m)
5’ (1.5 m)
10’ (3 m)
3’ (1 m)
* Exit pit dimensions depend on pipe depth and product being installed.