Bunn Juicer JDF-4S User Manual

Page of 28
8
PRIMING
1.  Open the dispenser door 
2.  Load concentrate per instructions in section titled Loading.
3.  Close the dispenser door.
4.  Place a large container under the appropriate dispense nozzle.
Press and hold the “Product Dispense Switch” Fig 5, until concentrate dispenses from the dispense nozzle.
Note: This may take several seconds, depending on the installation and set pump speed.
OPERATING CONTROLS
FIG  7  Refrigeration Switch - JDF-2S
FIG  9  Product Dispense Switches - JDF-2S
Refrigeration Switch
The refrigeration switch is located on the Electrical Panel of the dispenser near the Circuit Board. This switch 
controls power to the water bath pump and relay contacts for the compressor and condenser fan motor.
Product Dispense Switch (Mechanical Switch Machines)
Pressing and holding switch will initiate product flow from the respective nozzle; releasing the switch will stop 
the flow.
P3583
FIG  10  Product Dispense Switches - JDF-4S
P3844
FIG  8  Refrigeration Switch - JDF-4S
44744 032811