Siemens Laptop programming the cpu 314c-2dp User Manual

Page of 25
 
 
 
 
 
 
 
   
Automation and Drives - SCE 
 
 
 
 
T I A  Training Document
 
Page 11 of 25 
  Module 
 
3. 
CREATING THE HARDWARE CONFIGURATION FOR THE CPU 314C-2DP 
 
In Step 7, files are managed with the 'SIMATIC Manager'. Here, program blocks can be copied, for 
example, or called for further processing with other tools by clicking on them with the mouse. Use of 
the SIMATIC Manager is in line with the usual Windows standards (e.g. right-clicking on a 
component causes its selection menu to appear). 
 
In STEP 7, each project is created with a fixed specified structure. The programs are stored in the 
following directories: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Project: 
This directory contains the 
hardware (e.g. SIMATIC 300 
stations) and the subnets 
(e.g. MPI and PROFIBUS). 
SIMATIC 300 stations: 
Here, the corresponding 
hardware configuration 
data (Hardware/SC*
1
) and 
CPU data are stored. 
Sources/SO*
1
Here, sources (e.g. SCL 
sources) are stored which 
can be changed into 
executable programs through 
conversion. 
Blocks/APoff*
1
Here, the program blocks 
( OB, FB, FC, SFB, SFC, 
DB etc. ) are stored. 
Symbols/SY*
1
Here, the symbol lists for 
symbolic addressing are 
stored. 
CPU: 
Here, the S7 
program and the 
networked 
connection partners 
(Connections/CO*
1
are entered. 
S7 Program: 
Here, the user programs 
(Blocks/AP off*
1
), symbol 
tables (Symbols/SY*
1
) and 
sources (Sources/SO*
1
) are 
managed. 
 
*
1
 Designations from STEP 7 Version 2.x 
 
Foreword                     Notes                      Hardware configuration                      STEP 7 program                      Testing 
A5 
Issue date: 02/2008                                                                                                                          Programming the CPU 314C-2DP