Thermador PH30HS Installation Instruction

Page of 48
English 8
Assembly and Installation of 
the Duct Covers
Optional duct covers shown in Figure 10 may be used to fill 
the space between the hood and ceiling in wall mount 
installations. 6" and 12" high duct covers are available and 
may be ordered separately.
1. If multiple duct covers are used, connect the pieces 
together using sheet metal screws provided with the 
duct cover accessories.
2. Attach the duct cover(s) to the hood using sheet metal 
screws as shown in Figure 10.
3. From inside of hood, insert screws supplied (#8 x 5/8") 
through holes labeled “L,” one (1) on each side and 
four (4) along the front, into bottom of the cover. 
Cabinet Installation
The hood can be installed under a cabinet by supporting 
the hood from the top.
Note:
The cabinet must be structurally joined to the wall studs to 
support the weight of this hood.
Figure 11 shows the four (4) screw holes labeled “K” used 
for mounting the hood to the bottom of the cabinet.
Make sure both knockouts have been removed.
1. In the base of the cabinet, drill 1/8" tap holes (See 
Dimension A in Figure 11 and in Table). Screw in 
four (4) #10 x 1" screws (provided with hood) leaving 
1/4" exposed.
2. If the hood is installed for vertical discharge, use 
Figure 12 to create clearance holes for passage of the 
transition and conduit (See Dimension B in Figure 12 
and in the Table.)
 Figure 10: Attachment of Duct Cover(s) to Hood
#8 x 3/8 “ 
screw 
(quantity 
dependent 
on screw 
size)
L
L
L
 Figure 11: Tap Hole and Screw Hole Locations
Tap Hole Locations
1-9/16”
K
A
23”
7-1/16”
L
K
L
L
Note: 
This figure depicts 
tap hole and screw 
hole locations only. 
See Figure 2 on 
page 4, for overall 
hood dimensions.