Emerson MMI-20019043 User Manual

Page of 374
You may need to wait a few seconds while ProLink II synchronizes its database with
the transmitter data.
2.
Review the information presented on the screen, and click Next.
3.
Enter any desired information on the Test Definition screen, and click Next.
All information on this screen is optional.
4.
Choose the desired output behavior.
Option
Description
Outputs Continue
Measuring
During the test, all outputs will continue to report their assigned proc-
ess variable. The test will run for approximately 90 seconds.
Outputs Held at Last
Value
During the test, all outputs will report the last measured value of their
assigned process variable. The test will run for approximately
140 seconds.
Outputs Held at Fault
During the test, all outputs will go to their configured fault action. The
test will run for approximately 140 seconds.
5.
Press Start Meter Verification.
Test progress is displayed on the screen.
Postrequisites
View the test results and take any appropriate actions.
Run a Smart Meter Verification test using ProLink III
1.
Choose Device Tools > Diagnostics > Meter Verification > Run Test.
You may need to wait a few seconds while ProLink II synchronizes its database with
the transmitter data.
2.
Enter any desired information on the Test Definition screen, and click Next.
All information on this screen is optional.
3.
Choose the desired output behavior.
Option
Description
Continue Measur-
ing
During the test, all outputs will continue to report their assigned process
variable. The test will run for approximately 90 seconds.
Held at Last Value During the test, all outputs will report the last measured value of their as-
signed process variable. The test will run for approximately 140 seconds.
Held at Fault
During the test, all outputs will go to their configured fault action. The
test will run for approximately 140 seconds.
4.
Press Start.
Test progress is displayed on the screen.
Measurement support
178
Micro Motion
®
 Model 2700 Transmitters with Analog Outputs