Postrequisites
View the test results and take any appropriate actions.
Run a Smart Meter Verification test using the
Field Communicator
1.
Navigate to the Smart Meter Verification menu:
Overview
 > Shortcuts > Meter Verification
Service Tools
 > Maintenance > Routine Maintenance > Meter Verification
2.
Choose Manual Verification.
3.
Choose Start.
4.
Set output behavior as desired, and press OK if prompted.
Option
Description
Continue Measuring
During the test, all outputs will continue to report their assigned proc-
ess variable. The test will run for approximately 90 seconds.
Outputs Held at Last
Value
During the test, all outputs will report the last measured value of their
assigned process variable. The test will run for approximately
140 seconds.
Outputs Held at Fault During the test, all outputs will go to their configured fault action. The
test will run for approximately 140 seconds.
Test progress is displayed on the screen.
Postrequisites
View the test results and take any appropriate actions.
11.2.4
View test data
You can view the results of the current test. You can also view results from previous tests.
The transmitter stores the following information about the last twenty Smart Meter
Verification tests:
Powered-on hours at the time of the test.
Test result (Pass, Fail, Abort).
Stiffness of the left and right pickoffs, shown as percentage variation from the
factory value. If the test aborted, 0 is stored for these values.
Abort code, if applicable.
In addition, ProLink II and ProLink III provide a detailed test reporting and analysis
framework. This information is stored on the PC where ProLink II or ProLink III is installed. It
includes:
Timestamp from the PC clock
Measurement support