150/175kw Modular PDU Installation
6
Perform Equipotential Bonding
Proper bonding is essential to create an equipotential plane 
between service grounds and equipment during fault and 
transient conditions.
Connect the two equipotential bonding conductors between 
adjacent enclosures in the system. The bonding conductors are 
pre-connected to the PDU. The M8 nuts and washers are 
supplied in the accessory kit. Move the equipotential
 
bonding 
wires to fit your system configuration. 
Connect and Level Enclosures
The equipment must be installed on a level floor. The 
leveling feet will stabilize the enclosure, but will not account 
for a badly sloped floor. If the PDU is on a raised-tile floor, 
verify that it is properly aligned with the tiles. 
1. Align the enclosures.
2. Use a screwdriver to lower the four leveling 
feet.
3. Use a 13/17 mm wrench to adjust the leveling 
feet. Do not move the enclosure after the 
leveling feet have been lowered.
4. Turn the joining brackets and secure with a 
screw to connect the enclosures.