Sterling XXX10-80 User Manual

Page of 112
10-Pump, 80-Station Controller 
Chapter 3:  Installation 
49 
 
3-6    Initial Startup 
Once you have finished all the setup described above, you are ready to start the system. To do 
so: 
1.  At any screen, touch Stations on the right-hand side of the screen. 
The Station Status screen appears. 
2.  For each station that you want to use, briefly touch its icon. 
The icon turns blue, indicating that the station is ready or yellow, indicating that the 
station needs material. 
3.  Touch Pumps
The Pump Status screen appears. 
4.  For each pump that you want to use, briefly touch its icon. 
The icon turns blue, indicating that the pump is ready. 
5.  Touch Push to Start System in the lower right-hand corner of the screen. 
The system starts. If any alarm messages appear on the top of the screen, see Section 
3-5 on page 61.