User ManualTable of Contentsfront cover1before you start2tools needed for installation3parts supplied for installation3parts owner must supply3gas supply requirements3electrical requirements4exhaust requirements5exhaust duct connection6recessed area and closet installations7to change to a 30- or 60- minute timing cam7now start81 - check that each leg is approximately 1 inch from base82 - wipe the interior of the drums thoroughly with a damp cloth83 - install coin vaults and locks into meter case openings84 - install control panel lock and key85 - change the 45 minute timing cam if you would like86 - open control panel & attach slide extension to the coin-slide mechanism87 - secure coin-slide from inside the control panel88 - repeat steps 6 and 7 for the other coin-slide89 - attach wire guard around coin-slide mechanism810 - remove the red caps from the gas pipes911 - connect gas supply to each dryer912 - open the shutoff valves in the gas supply lines913 - use a brush and liquid detergent to test for gas leaks914 - plug power supply cords into grounded outlets915 - turn one dryer on to remove air from the gas supply line916 - check levelness of dryers and adjust legs if needed917 - to exhaust the dryers, see "Exhaust requirements"918 - attach both ends of tether at rear of dryer to a secured 2 x 4919 - check to make sure you have all your tools10if dryers do not operate properly11move dryers to a new location11if you need assistance11Size: 1010 KBPages: 12Language: EnglishOpen manual