Chamberlain PD612KLD Manual De Usuario

Descargar
Página de 36
11
Garage
Door
A14
 Header Bracket
A14
Header
Bracket
Mounting 
Hole
Existing
Header Bracket
C2
 
Spacer
Mounting
Hole
Existing
Clevis Pin
Option with
some pre-existing 
installations
C11
Clevis Pin
C6
 
Ring Fastener
Opener Carton
Ceiling Mount
A14
Header
Bracket
Mounting 
Hole
C11
Clevis Pin
C6
 
Ring Fastener
NOTE: If the door spring
is in the way, you’ll need
help. Have someone hold
the opener securely on a
temporary support to allow
the rail to clear the spring.
Attach Rail to the Header Bracket
UP
Center bracket on the “center 
of garage door” 
line and the 
horizontal line made in Step 2.
Highest Point
of Travel
A14
 Bracket
Mark the top
and bottom 
bracket holes
Horizontal Line
Center of 
Garage Door
Drill two 3/16" 
pilot holes
UP
Secure bracket 
with lag screws
C18 
Lag Screw
Mark Bracket Holes
Drill Holes
C
ALL HARDWARE
SHOWN
ACTUAL SIZE
Attach Bracket
MOUNT THE HEADER BRACKET
NOTE: If your installation requires that the
header bracket be mounted to the ceiling. The
back edge of the bracket MUST NOT be
further than 6" (15 cm) from the header wall
and the arrow MUST point away from the
header wall.
Ceiling Mount the Header Bracket (Optional)
C6 
Ring  Fastener 
C2 
Spacer 
C11
Clevis Pin
C18
Lag Screw
Center the bracket 
on the “center of 
garage door”
 line 
U
P
A14
Bracket
Use holes on
left and right side
to secure bracket
4
5
6
7