Crestron electronic 2.5 Manual De Usuario

Descargar
Página de 60
        
Installation & Operation Manual
4  
Sidewall direct venting 
(continued)
  
2.  Place wall penetrations to obtain minimum clearance 
of 12 inches (305 mm) between vent pipe and adjacent 
air inlet, as shown in FIG. 4-4 for U.S. installations.  For 
Canadian installations, provide clearances required by 
CSA B149.1 Installation Code.
3.  The air inlet of a Crest is part of a direct vent 
connection.  It is not classified as a forced air intake 
with regard to spacing from adjacent boiler vents.
  12" MIN
36" MIN
48" MAX
   12"
  36"
   12"
AIR
VENT
Figure 4-4 Multiple Vent Terminations (must also 
comply with Figure 4-1)
 
DIRECT VENT TERMINATIONS
Air Inlet
Vent Termination
Dryer Inlet
Straight
90° Elbow
Mitered
23° Elbow
Figure 4-5 Direct Vent Terminations
ROOM AIR (DIRECT EXHAUST TERMINATIONS)
Vent Termination
23° Elbow
45° Elbow
90° Elbow
Figure 4-6 Room Air (Direct Exhaust Terminations)
Room air 
AIR INLET COVER
Figure 4-7 Room Air Installation
The Crest boiler may be installed with a single pipe carrying the 
flue products to the outside while using combustion air from 
the equipment room.  
Follow the requirements in the General Venting, Sidewall Direct 
Venting, and Vertical Direct Venting sections for vent material 
specifications, vent length requirements, and vent termination 
requirements.
Install the air inlet cover (shipped loose with the boiler) per 
FIG. 4-7.  Combustion and ventilation air must be supplied to 
the equipment room per the requirements on pages 12 and 13 
of this manual for proper operation of the Crest boiler when 
utilizing the single pipe method.
23