Cisco Systems OL-7822-06 Manual De Usuario

Descargar
Página de 64
2-2
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 2      Rack-Mount the SCE 1000
  Attach the Brackets to the SCE 1000
Figure 2-2
Mounting Bracket for 4-post   Racks
The SCE 1000 mounts to the two front rack posts with brackets that attach to the front of the SCE 1000 
The inside width between the two posts or mounting strips (left and right) must be at least 17.3 inches 
(44 cm).
Note
Remember to leave a two-inch (5 cm) clearance on both sides of the SCE 1000 and at the rear for 
adequate airflow for the inlet and exhaust vents.
Attach the Brackets to the SCE 1000  
Before installing the SCE 1000 in the rack, you must first install an appropriate rack-mount bracket on 
each side of the front of the SCE 1000, as illustrated in the following figures.
Figure 2-3
Attaching the Mounting Brackets   (4-post)
210430
LINK RX TX
RX
MM
TX
LINK RX TX
RX
MM
TX
PWR B STATU
S
PWR A
BYPASS
10/100/
1000
LINK/
ACTIVE
10/100/
1000
LINK/
ACTIVE
AUX
CONSOLE
MNG 2
MNG 1
Cisco SCE 
1000 
Series
2xGBE
GBE-1
SUB
LINE
NET
1
2
210418