Cisco Systems OL-7822-06 Manual De Usuario

Descargar
Página de 64
2-3
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 2      Rack-Mount the SCE 1000
  Installing the Crossrail Supports (Four-post rack only)
Figure 2-4
Attaching the Mounting Brackets   (2-post)
To install the rack-mount brackets on the SCE 1000 chassis, complete the following steps:
Before installing the SCE 1000 in the rack, you must first install a rack-mount bracket on each side of 
the front of the SCE 1000.
Step 1
Align the rack-mount bracket to the side of the SCE 1000. Choose the proper bracket for your installation 
(2-post rack or 4-post rack) as illustrated in 
Step 2
Insert and tighten three screws.
Step 3
Repeat steps 1 and 2 on the other side of the SCE 1000.
If mounting the SCE 1000 in a rack with only two posts, skip to 
If mounting the SCE 1000 in a rack with four posts, proceed to the next step, 
Installing the Crossrail Supports (Four-post rack only)  
This section provides information for assembling the crossrail supports and attaching them to the rack.
When mounting in a rack with four posts (front and back) the two crossrail supports are mounted one on 
each side of the rack. The SCE 1000 then slides into these crossrails, which support the weight of the 
unit.
Assemble the Crossrail Supports    
Step 1
Assemble the two crossrail supports. Use three screws for each crossrail assembly.
LINK RX TX
RX
MM
TX
LINK RX TX
RX
MM
TX
PWR B STATU
S
PWR A
BYPASS
10/100/
1000
LINK/
ACTIVE
10/100/
1000
LINK/
ACTIVE
AUX
CONSOLE
MNG 2
MNG 1
Cisco SCE 100
Series
2xGBE
GBE-1
SUB
LINE
NET
210603
1
2