KitchenAid KSSC36QMS Manual De Usuario

Descargar
Página de 76
20
5. Using a grounded drill, drill a 
¹⁄₄" hole in the cold water pipe 
you have selected.
 
6. Fasten the shutoff valve to the cold water pipe with the pipe 
clamp. Be sure the outlet end is solidly in the 
¹⁄₄" drilled hole 
in the water pipe and that the washer is under the pipe clamp. 
Tighten the packing nut. Tighten the pipe clamp screws 
slowly and evenly so washer makes a watertight seal. Do not 
overtighten, or you may crush the copper tubing. 
7. Slip the compression sleeve and compression nut on the 
copper tubing as shown. Insert the end of the tubing into the 
outlet end squarely as far as it will go. Screw compression nut 
onto outlet end with adjustable wrench. Do not overtighten 
the clamp or the sleeve. This will crush the copper tubing.
8. Before attaching copper tubing to the refrigerator place the 
free end of the tubing in a container or sink and turn on the 
main water supply. Flush at least 2 qt (1.9 L) of water through 
the copper tubing until water is clear to get rid of any particles 
in the water line. Turn off the shutoff valve on the water pipe. 
Coil the copper tubing.
9. Check for leaks around the saddle valve.
Connecting to Refrigerator
Style 1 - Copper Line Connection
1. Remove the shipping tape from the gray, coiled water tubing 
on the rear of the refrigerator. 
2. 
¹⁄₄" x ¹⁄₄" coupling is needed in order to connect the water 
tubing to an existing household water line. Thread the 
provided nut onto the coupling on the end of the copper 
tubing. 
NOTE: Tighten the nut by hand. Then tighten it with a wrench 
two more turns. Do not overtighten. 
3. Turn shutoff valve ON.
4. Check for leaks. Tighten any nuts or connections (including 
connections at the valve) that leak.
5. Flush the water system. See “Water System Preparation.”
NOTE: Allow 24 hours to produce the first batch of ice. Discard 
the first three batches of ice produced. Allow 3 days to 
completely fill ice container.
Style 2 - Shutoff Valve Connection
1. Remove the shipping tape from the gray, coiled water tubing 
on the rear of the refrigerator.
2. Thread the provided nut onto the water valve as shown.
NOTE: Tighten the nut by hand. Then tighten it with a wrench 
two more turns. Do not overtighten. 
3. Turn shutoff valve ON.
4. Check for leaks. Tighten any nuts or connections (including 
connections at the valve) that leak.
5. Flush the water system. See “Water System Preparation.”
NOTE: Allow 24 hours to produce the first batch of ice. Discard 
the first three batches of ice produced. Allow 3 days to 
completely fill ice container.
Plug in Refrigerator
1. Set control switch at top of cabinet to the OFF position. 
2. Plug into grounded 3 prong outlet.
A. Cold water pipe
B. Pipe clamp
C. Copper tubing
D. Compression nut
E. Compression sleeve
F. Shutoff valve
G. Packing nut
A. Refrigerator water tubing
B. Nut (provided)
C. Bulb
D. Coupling (provided)
E. Ferrule (purchased)
F. Nut (purchased)
G. Household water 
line
A
B
C
D
E
F
G
A
B
C
D
E
F
G
A. Bulb
B. Nut (provided)
A
B
Electrical Shock Hazard
Plug into a grounded 3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions can result in death, 
fire, or electrical shock.
WARNING