Graco Inc. CED1 Manual De Usuario

Descargar
Página de 19
Pressure Relief Procedure 
6
3A0245A
3.
Insert cotter pin.
4.
Place one hand on control tube and one hand at 
bottom of mud tub while in use.
5.
Place tape at bottom of joint (slide tube forward to 
feed tape). 
6.
Lead with head of taper to make tracking easier. 
Large trigger feeds material through tool. Small 
trigger retracts creasing wheel.
7.
Roll tape over seam with only one wheel in contact 
with wall until approximately three inches from end 
of seam.
8.
Stop completely and pull tube back to cut tape.
9.
Use drywall knife to detail seams and overlap.
NOTE: Clean all tools thoroughly after every use. Use a 
brush and water to remove all joint compound from 
tools. Once tools have been cleaned, lightly oil using 
any light machine oil.
Pressure Relief Procedure
1.
Turn flow control knob OFF.
2.
Point applicator into hopper and trigger to relieve 
pressure.
3.
Fluid from pressure relief valve can splash in eyes 
or skin and cause serious injury. Keep hands clear 
of pressure relief valve. Wear safety glasses.