Orbit Manufacturing ORBIT 2000 Manual De Usuario

Descargar
Página de 139
Page 4 - 9
Installation
Orbit™ 2000 Operation and Maintenance  Manual
 © GBC Films Group January 2001
4.7  Initial inspection
ELECTRICAL
S H O C K
Remove power to the laminator before performing step ( a ) below. Contact with
electrical components while power is supplied can result in injury or death!
a/
Electrical assembly inspection
– Component mounting
– Terminal security
– Wire tightness
– Circuit breaker wires
ELECTRICAL
S H O C K
Electrical troubleshooting should be left to qualified GBC service technicians!
Electrical shock hazard!
b/
Protective circuit inspection
– The safety of protective circuits may be checked by feeding a current of at least 10 A (50
     Hz) from the PELV source for at least 10 seconds. The test is done between the PE terminal
    and various points that are part of the protective circuit. See EN 60204-1, article 20.2.