Graco 3A2894F - ExactaBlend AGP Advanced Glazing Proportioner Manual De Usuario

Descargar
Página de 78
Shutdown 
48
3A2894F
e.
Close the calibration check assembly.
f.
Clean the nozzles of the calibration check 
assembly and install the JIC caps.
g.
Close the base (A) and catalyst (B) main air 
slider valves.
h.
If electrical power is not supplied to the 
machine, place a waste container underneath 
the pump bleed valves. Open the pump bleed 
valves. Clean the pump bleed valves once com-
plete.
NOTE: For U100 systems, the catalyst bleed valve is 
located on the pump outlet filter.
Shutdown
1.
2.
Turn the power off at the electrical enclosure.