•  For  units  equipped  with  a  power  cord,  the 
cord and plug may be aligned with a recess in 
the back panel to allow the unit to be pushed 
closer to the wall. For correct alignment, the 
wall outlet must be located 4” - 10” above the 
floor.
•  Floor must be level in area of installation. 
Preparing the Space
CAUTION
Make sure the floor under 
the  unit  is  level  with  the 
surrounding finished floor. Protect a finished 
floor with plywood, cardboard or some other 
suitable material before moving the unit into 
place. Failure to do this may result in damage 
to the floor.
NOTE: If unit has been laid on its back or sides, 
place unit upright and allow minimum of 24 hours 
before connecting to a power source. Failure to 
follow this procedure may damage the compressor 
and void warranty.
1.  Make  sure  the  space  opening  is  correctly 
sized for the unit. See  Dimension drawings at 
the back of this manual for correct dimensions.
NOTE: For a cabinet door to open properly, the 
door must open a minimum of 90°. Use a minimum 
3”  filler  in  corner  installations  to  assure  a  90° 
opening. Allow 24” clearance in front of the unit 
for full door swing and shelf/drawer pull-out.
2.  Check that the following are level and square:
•  Front and interior opening
•  Installation opening and floor surface
NOTE: The floor under the unit must be at the 
same level as the surrounding finished floor.
Casters or Legs
Refer to the instructions included with the Casters 
or Legs Kit. 
Installing the Unit
CAUTION
If unit has been laid on its 
back  or  sides,  place  unit 
upright and allow minimum of 24 hours before 
connecting power.
1.  With  power  applied  to  the  unit,  check  that  
the  lighting  and  cooling  functions  operate 
properly, then turn off power to the wall outlet 
and/or circuit breaker.
2.  Position the cabinet into place using rollers 
when necessary. 
NOTE: Proper air flow around the condensing unit 
is necessary for efficient operation. Never obstruct 
the air flow in and out of the condensing unit.
3.  When cabinet is in place, check installation 
with carpenter’s level. When the unit is level 
front-to-back  and  side-to-side,  accumulated 
water will drain out of cabinet to evaporator 
drain.
4.  Turn  on  power  to  the  outlet  and/or  circuit 
breaker.
Electric Condensate Evapaway 
(Optional)
For installation in areas of high humidity, a 115-
volt  electric  condensate  pan  can  be  installed 
underneath the cabinet to collect and evaporate 
the condensate from the cabinet evaporator. A 6’ 
3-prong plug is included. A separate circuit should 
be provided for the heater. The kit can be used 
only on cabinets equipped with 4” minimum legs; 
it cannot be used on units equipped with platform 
or  base  plate  kits.  Follow  instructions  supplied 
with the kit.
Base Plate Installation (Optional)
Once the unit is secured in place, install the base 
plate brackets to the cabinet bottom in the holes 
provided. Attach  base  plate  to  brackets.  Refer 
to the installation instructions included with the 
Base Plate Kit.