RAD Data comm ASM-60 Manuel D’Utilisation

Page de 74
Chapter 3  Operation 
ASM-60 Installation and Operation Manual 
3-2 Operating 
ASM-60
 
 
Table 3-1.  ASM-60 LED Indicators (Cont.) 
Name Function 
SYNC A (red/green)  
ON (red) – Data link A is not synchronized with the remote modem. 
ON (green) – Data link A is synchronized with the remote modem. 
SYNC B (red/green)  
ON (red) – Data link B is not synchronized with the remote modem. 
ON (green) – Data link B is synchronized with the remote modem. 
3.2 Operating ASM-60 
Turning On ASM-60 
ASM-60 is turned on as soon as the power is connected to the unit. The PWR 
indicator lights up and remains lit as long as ASM-60 receives power. 
ASM-60 requires no operator attention once installed, with the exception of 
occasional monitoring of front panel indicators. Intervention is only required for 
the ASM-60 configuration events monitoring. 
Normal Indications 
Table 3-2 shows the status of the ASM-60 indicators, a few seconds after 
power-up. 
Table 3-2.  ASM-60 Indicator Status 
Indicator Status 
PWR ON 
TD 
Depends on DTE data transmission. 
RD 
Depends on DTE data transmission. 
RTS 
Depends on DTE RTS signal status. 
DCD 
Depends on remote modem data transmission. 
TST OFF 
ALM OFF 
SYNC A/SYNC B  Green or red, depending on remote modem data 
transmission. 
If the above LED indications are not obtained following initial power turn-on, refer 
to Chapter 5 for the diagnostic test instructions. 
Turning Off ASM-60 
To turn off ASM-60, remove the power cord from the power source.