Raritan Computer CCA-0N-V5.1-E Manuel D’Utilisation

Page de 420
 
Chapter 14: System Maintenance 
 
 
233
 
 
 
Primary Node Upgrade Failure 
If the upgrade of your primary node fails while following the 
Upgrading a 
Cluster
 (on page 232) procedure, follow these steps to complete the 
cluster upgrade. 
1.  If the primary node upgrade fails, shutdown the CC-SG application 
by choosing System Maintenance > Shutdown. When you shutdown 
the CC-SG application, the unit is still powered on, and accessible 
through the Diagnostic Console. See 
CC-SG Shutdown
 (on page 
234) for details. 
2.  Restart your backup node. See 
Restart CC-SG with Diagnostic 
Console
 (on page 315) for details on restarting. 
3.  The backup node goes into Primary status. 
4.  Contact Raritan Technical Support to determine why the upgrade 
failed.   
 
Migrating a CC-SG Database 
To replace a physical CC-SG unit with a new one, or migrate from a 
physical CC-SG unit to a virtual CC-SG, follow this recommended 
migration procedure. 
 
Requirements for Migration 
 
Both CC-SG units must be at the same version of firmware and 
version 5.1 or higher. 
 
You must have valid licenses for the CC-SG you are migrating your 
database to before your migrated CC-SG can be fully functional. 
 
Migrate a CC-SG Database 
 
To migrate a CC-SG database: 
1.  Pause management of all devices. Optional. You can schedule a 
task to pause all devices, if you are using CC-SG firmware version 
5.1 or higher. See 
Schedule a Task
 (on page 280)
2.  Perform a Full Backup of the CC-SG that you are migrating from. 
Make sure you select Full as the Backup Type, and save the backup 
file to a remote location. See 
Backing Up CC-SG
 (on page 222)
3.  On the CC-SG that you are migrating from, choose System 
Maintenance > Shutdown to shutdown the CC-SG application. 
4.  On the CC-SG that you are migrating to, upload the Full Backup file, 
then perform a Full Restore. Make sure you select Full as the 
Restore Type. See 
Restoring CC-SG
 (on page 225).