Delta Tau GEO BRICK DRIVE Manuel D’Utilisation

Page de 294
 Geo Brick Drive User Manual 
Pinouts and Software Setup 
 27 
Power On/Off Sequence 
 
 
Caution 
The  main  bus  power  should  NEVER  be  applied  if  the  24V  logic 
power is NOT applied.    
 
 
Caution 
Make  sure  that  no  motor  commands  (e.g.  phasing,  jogging,  or  open 
loop)  are  being  executed  by  or  sent  repeatedly  to  the  controller 
(PMAC) at the time of applying main bus power.  
 
 
Powering up a Geo Brick Drive must obey the following procedure: 
1.  Apply 24V logic power 
2.  Wait a minimum of ~3 seconds 
3.  Apply main bus power 
 
 
Powering down a Geo Brick Drive must obey the following procedure: 
1.  Disconnect main bus power 
2.  Wait a minimum of ~5 seconds 
3.  Disconnect 24V logic power 
 
 
Cycling Main Bus Power 
 
 
Caution 
Main bus power should NEVER be applied or cycled if the 24V logic 
power is NOT applied. 
 
Newer and older Geo Brick Drives differ in the delay restrictions between main power cycles. 
 
 
The  newer  models  were  introduced  in  October  of  2012.  They  can  be  recognized  by  the  4-pin 
terminal block 24V logic with STO connector. 
 
 
The older models carry the Molex type 2-pin 24V logic connector