SPX Cooling Technologies 800 Manuale Utente

Pagina di 28
         
Inspection Checklist
Date Inspected
Inspected By
Owner
Location
Owner's Tower Designation
Tower Manufacturer
Model No.
Serial No.
Process Served by Tower
Operation:
Continuous ❏  Intermittent ❏     Seasonal ❏
Design Conditions
GPM
    HW
°F
   CW
°F
   WB
°F
Cell No.
Number of Fan Cells
Tower Type: Counterflow
Date Tower was installed
Condition:  1—Good    2—Keep an eye on it    3—Needs immediate attention
1 2 3
Comments
Structure
Casing Material
Structural Material
Fan Deck Material
Stairway ❏
Material
Ladder
Material
Handrail ❏
Material
Interior Walkway ❏
Material
Cold Water Basin Material
Water Distribution System
Spray Type System
Header Pipe Material
Branch Pipe Material
Nozzles—orifice diameter
 size  in.
Up spray ❏ Down spray ❏
Heat Transfer System
Fill—type & material
Eliminators—type & material
Louvers—type & material
Use this space to list specific items needing attention: